Georgia - Enguri Dam

The PRISMIC® DCP excitation system was chosen to replace the aging excitation systems at the Enguri Electric power station (HES). The HES is supplied by the Enguri Dam and as of 2009,  is the world's highest concrete arch dam with a height of 272 metres.

THE PRISMIC® was commissioned to replace all five of the existing excitation systems and can be controlled either from the local operator console or a central control room over Profibus DP allowing easy control of the generating plant. 

To view more projects showing our experience with new and upgrade systems click here

For more information on how we can assist you with your future excitation system requirement please click here 