BRUSH has delivered five BDAX 9.450ERH turbogenerators for Gas Treatment & Liquefaction Project in Australia.

BRUSH supply energy for treatment of natural gas in Australia

BRUSH delivered five turbogenerators of 118MW each for GE Oil & Gas, Italy for the Gorgon project in Barrow Island, Western Australia. It is one of the world´s largest projects for the treatment and liquefaction of natural gas and the largest natural gas project in Australia´s history. The yield of this gas deposit is estimated at 60 years.

Generator data

  • Type: BDAX 9.450ERH
  • Driver: Gas turbine GE Frame 9E
  • Power output: 5x 118 MW
  • Voltage: 15 kV
  • Frequency: 50 Hz
  • Cooling system: Closed air circuit, water cooled (CACW / TEWAC)
  • Excitation: Brushless AC exciter, automatic voltage regulator PRISMIC A32
  • Accessories: Line & neutral cubicles, rotor withdrawal gear, spare generator rotor