designed and manufactured in the UK

Built to last, delivered fast. FastWorks provides high-quality, high-performance, solutions for UK infrastructure.

Overview

Utilising our in-depth grid knowledge and engineering expertise, for those projects when rapid deployment matters, there’s FastWorks.

Offering significantly shorter lead times that with our bespoke transformer models, FastWorks transformers are available in a choice of pre-configured 33kV or 132kV variants, each designed for the UK grid and engineered to optimise build time.

And with no additional engineering required, FastWorks is ideal for critical infrastructure projects where high-performance, superior quality, and quick delivery is required.

Key benefits

Made in the UK, for the UK
Purpose-built for the UK energy network
Improved lead time
24 weeks for 33kV transformers, 52 weeks for 132kV transformers
Service support
Full BRUSH technical backup and after-sales care
Complies with criteria
Meets current UK infrastructure Tier 2 and IEC requirements

Technical summary

Voltage options33kV and 132kV
Warranty2.5 years
OriginUK manufactured
ComplianceTier 2, UK regulatory standards
project case study

A leading multi-utility infrastructure provider, needed a pre-configured transformer solution in Coventry, England that offered rapid deployment and delivered on quality and performance. The turnaround for this project was 30 weeks from order to install.

The solution was three FastWorks 33kV rated at 33/11.5kV, 20/25/40MVA transformers. ​FastWorks’ accelerated lead time delivered on the client’s requirement for a rapidly manufactured power transformer. ​It was backed by full warranty and support from BRUSH’s team of highly experienced service engineers 24 hours a day, 365 days a year.

Contact us

We’d love to work with you

* = Required

"*" indicates required fields

First Name*
Last Name*
Country*
This field is hidden when viewing the form